MG

Energy · Poland · since 2003

Maksymilian
Górniak

He built it. He lost everything. He's building again.

A story in three acts.

Co-builder of two of Poland's three largest power blocks. Today he is building energy storage, biogas, and the artificial intelligence that orchestrates the grid.

Energy · Poland
Scroll
In his track record
ENEA S.A. PGE ZPUE Kozienice Power Plant Bełchatów Power Plant ROCA TRADE EFET
Act I

The Empire

Twenty years at the heart of Polish energy. Since 2003, Maksymilian Górniak built, traded and structured the country's largest energy assets — from generation, through trading, to transmission and distribution.

He served on the management and supervisory boards of Poland's largest energy companies, including ENEA S.A. He introduced the global EFET standard contracts to the Polish market, with protective clauses that shielded BOT Górnictwo i Energetyka (today PGE) during the 2008 crisis. He acquired the only operable cross-border power line connecting Poland, Belarus and Russia, negotiating terms at the ministerial level of three states.

Maksymilian Górniak — the empire builder

The empire builder

What he built · single-line diagram
Kozienice1075 MW Bełchatów980 MW ENEA S.A.board ZPUEenergy storage ROCA TRADE~PLN 1.5bn
By the numbers
2 of 3Major Polish power blocks — built with his involvement
~PLN 1.5bnROCA TRADE group revenue — in one year
17,000+Employees in the ENEA group
136,000 kmNetwork at ENEA Operator
Act II

The Trial

Maksymilian Górniak — after the fall

When everything was taken

In 2017, everything collapsed. Detained, imprisoned — and held in pre-trial detention for years, without an indictment.

The system that was meant to judge him simply held him. He lost his freedom. He lost his companies. He lost the fortune he had built over a decade. Year after year passed behind bars — without a verdict, without a trial that would ever end.

He walked out in 2023. And in the end the proceedings were overturned and discontinued in full — completely cleared. Never convicted. He left with nothing — but clean.

"You can take everything from a man — except who he is."Act II

The Arc

A single line

An entire career as one curve of energy: a rise, a sudden fall, and a climb again.

2003start 2014peak · empire 2017arrest 2023freedom Empire 2.0the goal WE ARE HERE
Timeline

The Road

Act IThe Empire · 2003–2016
2003
Entry into energy
Work with Elektrownia Kozienice, BOT Górnictwo i Energetyka (today PGE) and ZPUE.
2010
Board of ENEA S.A.
Vice-president for commercial affairs; trading, transmission and distribution at national scale.
2010–2012
Major power blocks
Initiation and preparation of the 1,075 MW unit at Kozienice; legal-financial structure of the 980 MW unit at Bełchatów.
2013–2014
ROCA TRADE and MOMO S.A.
Scaling ROCA to ~PLN 1.5bn revenue in a year; restructuring MOMO to ~PLN 70M market cap.
Act IIThe Trial · 2017–2023
2017
Arrest
Pre-trial detention. The start of a years-long trial.
2017–2023
Years without a verdict
Detention dragged on for years — without an indictment.
Act IIIEmpire 2.0 · now
2023
Freedom
Release.
2026
Full vindication
Proceedings overturned and discontinued in full. Never convicted.
Now
Empire 2.0
Part two — building again, bigger.
Act III

Empire 2.0

Today he is building again — and bigger. Poland as the energy-storage manufacturing hub for all of Central and Eastern Europe.

Four areas — all within energy: biogas, biomethane, energy storage (BESS), and artificial intelligence that orchestrates the entire grid in one intelligent system.

This is only the beginning.Act III — Now

Maksymilian Górniak — today, looking to the future

The best is yet to come

Platform · system architecture
AI orchestration Energy storageBESS Biogas & biomethaneRES Power gridhydrogen

The goal

Poland as the energy-storage manufacturing hub for Central and Eastern Europe.

Empire 2.0 · under construction

FAQ

Frequently asked

01

Who is Maksymilian Górniak?

A Polish energy executive and entrepreneur with more than 20 years in the power sector (since 2003). He served on the management and supervisory boards of Poland's largest energy companies, including ENEA S.A. Today he works across four areas, all within energy: biogas, biomethane, energy storage (BESS), and artificial intelligence.

02

What did he build in the energy sector?

Of the three major power blocks built in Poland over the last 30 years, two were created with his significant involvement: the 1,075 MW unit at Kozienice and the 980 MW unit at Bełchatów. He introduced EFET contracts to the Polish market and scaled ROCA TRADE to roughly PLN 1.5 billion in revenue in a year.

03

What happened to him?

In 2017 he was detained and held in pre-trial detention for years without an indictment. He lost his companies and his fortune. The proceedings were ultimately overturned and discontinued in full — he was never convicted.

04

What is he doing today?

He is building again, all within energy: biogas, biomethane, energy storage (BESS), and artificial intelligence orchestrating the grid. The goal: Poland as the energy-storage manufacturing hub for Central and Eastern Europe.